PMT2016-05105


We do not have any information about this 61.

Owner Conctractor for a kitchen remodel that is primarily removal of 8.5′ of wall to “open up” the kitchen. As a result of the wall removal, the gas powered range to be relocated to the north interior wall. Work includes new LVL beams as shown on engin