4380 Ziegler Rd


Key Value
Address4380 Ziegler Rd, Fort Collins CO

Timeline

B1605466

1st time tenant finish for “broadcom” (electronics product testing lab) to include 872 sq ft on the 3rd floor. building owner authorization on file.

B1600046

Foundation and pad of 2200 sq ft to support a new rto (regenerative thermal oxidizer) on drilled piers and grade beams. the scope includes new mechanical ductwork and electrical hookups for the new rto for avago technologies.

B1505514

New 490 square foot pre-manufactured building for avago technologies, to be used for hazardous materials/chemicals. building to be set on cast-in-place utility trench and concrete pad. building owner authorization on file.

B1409407

Build a 371sqft concrete pad for the placement of an argon tank.

B1408353

Foundation and pad of 720sqft to support a new emergency generator for building 4 west annex (located on the west side) for avago technologies.

B1404186

Avago building 4 west expansion major amendment

B1306605

Avago building 4 west expansion major amendment

B1302557

Avago building 4 west expansion major amendment

B1201682

Preston-kelly 2

B1000186

Tenant finish of 16, 500 square feet for center partners – nw quad of upper floor for phase 2 of tenant separation

B0905458

16, 500 sq ft tenant finish of 1/4 of the upper floor to accomodate separate tenant

B0903378

Electrical panel to diesle tank pump

MA0700080

Avago chemical storage sheds

B0707095

Chemical safety storage facility 408 sf (shed)

B0707093

Chemical safety storage facility (shed)

B0604135

Preston-kelly 2

B0403397

Preston-kelly 2

B0301621

Remove existing hp/invent/agilent ground sign and install new agilent sign. 3.5 x 14 5.5 tall. base must be of same material or color as building

B0300357

Install medium voltage cable from fcpl manhole to 2 new mv switches. install cable in building 1 & 2 (for agilent) to 4 new switches. all per 2002 nec

B0107453

Demolish utilities and entrances to modulars 2 & 3. units will be removed by another company

B0016603

Tenant finish of cleanroom and support space in an existing shell building (building 4)

Suggest an edit.

Know about a project in the area? Let us know what you know.
  • Please provide an address, if available. Otherwise, please provide cross streets.
  • Add a new row
  • Add a new row
  • Add a new row
  • Add a new row
  • Add a new row
  • Add a new row
  • Add a new row
  • (Maximum of 300 words.)
  • Accepted file types: pdf, jpg, png, gif, jpeg.
    Upload any relative documents. Please make sure images are 300dpi or higher.
  • Your Information

    (For BizWest internal use only.)
  • This field is for validation purposes and should be left unchanged.

Suggestions

  • This field is for validation purposes and should be left unchanged.
Suggestions